fbpx

Sewer improvements construction to start in Fairhaven, Central Meadowbrook neighborhoods

The city will update residents about the construction schedule for sewer improvements in the Fairhaven and Central Meadowbrook neighborhoods at a meeting scheduled for 8 p.m. April 5 at Bethlehem Missionary Baptist Church (in the sanctuary), 1509 Wilson Road.

Existing sewer lines are being replaced on the following street segments:

  • Shilling Drive from Briarwood Lane to Kemble Street.
  • Kemble Street from Watson Street east 200 feet.
  • Barnett Street from Queen Street to Watson Street.
  • Brentwood Stair Road from Shilling Drive to 1,185 feet east.
  • Junius Street east 193 feet from Spear Street.
  • Easement north of Reed Street from Freddie Street to Donalee Street.
  • Easement between Wiman Drive and Reed Street from San Rose Drive west 800 feet.
  • Alley north of Normandy Road from Carl Street to North Edgewood Terrace.
  • Easement between South Hughes Avenue and Tahoe Drive from Wilbarger Street north 720 feet.
  • Easement between Tahoe Drive and Carmel Drive from Wilbarger Street north 720 feet.

Make plans to attend the meeting to hear the schedule and find out about impacts to residents.

To learn more, contact project manager Rakesh Chaubey at 817-392-6051.

leverton

Content is the most important part of having quality links to your website. With Area-Info.net, we provide a quality location to share your story and include links to your website to help you grow. If you would like to learn more, visit this page to see how you can use Area-Info.net to rank higher and quicker in search engines. Contact me directly at [email protected] with any questions, or to schedule speaking engagements.

You May Also Like