fbpx

North Wilshire Drive Construction Begins Monday, December 2, 2019

(Peoria, IL) On Monday, December 2, 2019, the City’s contractor, Otto Baum Company, will close N. Wilshire Drive from 6822 N. Wilshire to N. Donmar Drive to repair a culvert under N. Wilshire Drive. Residents north of the closure should use W. Teton Drive for access and residents to the south should use W. Giles Lane.

This project consists of upgrading three (3) culverts, grading ditches and installing riprap to armor the portions of the drainage ditches immediately upstream and downstream of the culverts in the Teton Neighborhood to improve drainage. This project is funded with Stormwater Utility funds.

This work will last approximately 2 weeks, weather permitting.

Motorists are encouraged to use extreme caution in construction zones.

For more information, please contact Stormwater Engineer Andrea Klopfenstein at (309) 494-8800.

11.27.19-Wilshire-Drive-Construction_1574892892.pdf 11.27.19 Wilshire Drive Construction

leverton

Content is the most important part of having quality links to your website. With Area-Info.net, we provide a quality location to share your story and include links to your website to help you grow. If you would like to learn more, visit this page to see how you can use Area-Info.net to rank higher and quicker in search engines. Contact me directly at [email protected] with any questions, or to schedule speaking engagements.

You May Also Like