fbpx

March 24: Stormwater Ordinance Changes Public Input Meeting

03/24/2020|
6-8 p.m., March 24, 2020, Room 206, Madison Municipal Building, 215 Martin Luther King Jr. Blvd., Madison, WI 53703

Over the past three years, the City of Madison and surrounding areas have experienced a large number of extreme storm events. The abundance of rainwater from the storms caused flash flooding and elevated lake levels, which also flooded low-lying areas in and adjacent to the Isthmus area. The active weather pattern has put pressure on the City’s stormwater sewer, which is the underground pipe system that catches water runoff and moves it to the area’s local waterways. When the stormwater system is overloaded with too much storm or rainwater, either in heavy rainstorms or multiple heavy rainstorms in a short amount of time, flooding happens. The stormwater sewer should not be confused with the City’s sanitary sewer, which is an underground pipe system that moves waste water from resident homes to a wastewater treatment plant.
The current stormwater sewer cannot support the heaviest rains, especially in certain areas. To minimize flooding, the City of Madison responded with watershed studies of the impacted areas, focus groups within specific neighborhoods to collaborate with neighbors in person, and a review of the City’s stormwater design standards, which affects both new and redevelopments. 
Madison General Ordinance Chapter 37 includes requirements for water quality, water quantity and erosion control design standards for anyone who wants to build in the City of Madison. City engineers reviewed the current ordinance  and standards. Based on the recent heavier rainfall the area is experiencing, City engineers updated the standards to support expected larger and more intense rain storms.
The proposed changes are posted to the City Engineering website, ready for review and feedback.
Comments should be emailed to [email protected] by April 10, 2020.
This is just one of three meetings being held: 

3-5 p.m., Feb. 26, 2020, Room 206, Madison Municipal Building,
215 Martin Luther King Jr. Blvd., Madison, WI 53703
6-8 p.m., March 5, 2020, Goodman Park Maintenance Facility,
1402 Wingra Creek Parkway, Madison, WI  53715
6-8 p.m., March 24, 2020, Room 206, Madison Municipal Building, 215 Martin Luther King Jr. Blvd., Madison, WI 53703

*Note: The Feb. 26, 2020 meeting is geared toward professionals and potential developers, which will be presented from a more technical perspective. The March 5, 2020 meeting will be presented from a more public perspective, which will include background, general overviews and proposed changes to the ordinance. The March 24, 2020 meeting will provide a recap of comments and final proposed ordinance language.
|03/24/2020 – 6:00pm to 8:00pm|Flooding|Madison Municipal Building

leverton

Content is the most important part of having quality links to your website. With Area-Info.net, we provide a quality location to share your story and include links to your website to help you grow. If you would like to learn more, visit this page to see how you can use Area-Info.net to rank higher and quicker in search engines. Contact me directly at [email protected] with any questions, or to schedule speaking engagements.

You May Also Like