fbpx

All Aboard Florida Construction Alert New River Bridge Operations April 2-17, 2017

All Aboard Florida (AAF) will be doing additional construction on the New River Bridge from April 2-17, 2017 that will impact the Florida East Coast railway bridge over the New River. During this time, the New River Bridge will operate as follows:
April 2, 2017 at 10 p.m. through April 3, 2017 at 8 a.m.
  • The bridge will be closed to marine traffic.
April 3-16, 2017 (Daily)
  • 8 a.m. to 10 p.m. – The bridge will be operated by a crane in accordance with its normal schedule.
  • 10 p.m. to 8 a.m. – The bridge will be in the down position, but will open to marine traffic on demand. The bridge will be operated via a crane so bridge openings will be slightly longer.
  • Mariners are encouraged to call the Florida East Coast railway bridge tender at 305-889-5572 or 954-325-0581. The bridge tender will also monitor Marine Channel 9.
April 16, 2017 at 10 p.m. – April 17, 2017 at 10 a.m.
  • The bridge will be closed to marine traffic.
Click here to read AAF’s media announcement.
 
Contacts
FEC Bridge Tender
305-889-5572 (landline)
954-325-0581 (cell)
Ali Soule, Director of Public Affairs, All Aboard Florida
305-520-2105 or [email protected]
USCG Seventh District Public Affairs
305-415-6683

You May Also Like